All the throw rods were clipped off that extended too far. I spent a good…
GaryJanuary 5, 2024
You may have thought I gave up! Busy doing other things - trip to California…
GaryJanuary 4, 2024
61 Tortoises have been installed in Gerber but not wired. These came from my previous…
GaryOctober 25, 2023
All the feeders have been installed for Gerber using 22-gauge wire. The red and white…
GaryOctober 20, 2023
All track in Redding is done. An additional track was added next to the wall…
GaryOctober 8, 2023
I finished installing 6 new switches and moving 2 more for the Gerber yard modifications. …
GaryOctober 5, 2023
I opened my layout up for the LDSIG during the National NMRA Convention in Dallas…
GarySeptember 26, 2023
I'm finally back to working on the layout and posting. A lot of August entailed…
GarySeptember 24, 2023
Labels were temporarily affixed. The valance has an industry chart. The finished one will indicate…
GaryAugust 7, 2023
My spray bottles arrived. One I used for larger areas in the past was reordered…
GaryAugust 1, 2023
A base coat of real dirt was applied using a kitchen strainer. I had containers…
GaryJuly 25, 2023
I started installing Tortoises in Proberta. I had hoped to use the same throw wire…
GaryJuly 24, 2023
My goal is to have one 35' scene done for Proberta by mid-August. I started…
GaryJuly 4, 2023
The benchwork that connect the swing gate at the door was finished today. That completes…
GaryJune 30, 2023
All the trackwork is in for Anderson and Girvan (Towns 5 & 6.) I still…
GaryJune 29, 2023
An eleven hour work day saw the completion of Cottonwood, town #4. There is not…
GaryJune 16, 2023
The basic track installation has been completed for the third town - Red Bluff. In…
GaryJune 13, 2023