Skip to main content

Fixing Odd and Ends

By November 14, 2026Uncategorized2 min read

November 14, 2026

Five locos had sound installed and were added to the layout.  Tom Person came over and we adjusted maximum speed to 30 mph for each.  I had already programmed the functions for sound and Tom adjusted the volume while we were adjusting speed.

The 10-track staging yard was tested by running multiple locos both directions.  Adjustments were made as needed.  On Nov. 5, we had mini-op session #2.  All problem areas from the first op session had been corrected.  New problems were noted for correcting, the goal to make operations problem free.  Sometimes track, sometimes a loco, other times a car.  Each is being taken care.

Attending the session were Tom Pearson, Mike Smith, and John Garfield.  Goal is to increase crew size to 8 once programming is worked out.  Now that staging is done, there are many changes that need to be made in TRAINS in JMRI.  I’ve been working on the schedules.  A new computer had the latest version of JMRI and MRSLAM FORMATTER installed and the same for 2 others that are networked with Dropbox.

John MRSLAM switchlists have font size increased to 12 instead of 10.  Done!  I have a glitch in automatically printing a switchlist when a train is run from JMRI so working on that.

The bridge across the door was used for the first time with John doing the honors.  Soon Mike followed up going through the staging yard and then across the bridge.  Cars arriving in the yard had the new car tags put on them for sorting.  Works great, found it is a 2-man job to be most efficient.

It was above 70 and humidity below 60% on Nov. 14 and over three dozen cars were painted outside.  Floquil and a mask were used.  Love Floquil in that it dries almost instantly.  I have a spray booth in the house but never hooked up the exhaust.  Now due to health will not be modifying the house and will continue to paint outside or in garage.

 

 

Leave a Reply