Operations Car Sorting I noticed that someone had been putting blue masking tape on the pulls. To help…GaryAugust 25, 2026
ConstructionElectrical One Huge Mistake! I'm back! Little has been done on the layout over the past few months due…GaryAugust 24, 2026
Operations Op Session #1 March 2 saw op session #1. It was to be a trail run with 4…GaryMarch 11, 2026
Operations Getting Ready for Op Sessions Oh, good grief. I'd swear I did a January post but perhaps got mixed up…GaryFebruary 15, 2026
ConstructionTrack All Track Installed!! October 28th is a Red Letter Day - all the track is in and wired.…GaryOctober 28, 2025
BuildingsConstructionElectricalLaser StructuresOperationsTrack Slow Progress I hate to share the little progress that has been made. Every week this month…GaryOctober 10, 2025
OperationsTrack Track 99.9% Done It has been a month of doctors' appointments, some chest issues for me and my…GarySeptember 13, 2025
OperationsTrack Operations Planning All cars and locations have been entered into JMRI. A lot of time has been…GaryAugust 15, 2025
Track Staging Tracks – Part 4 All switches for the east end of staging were laid down on a CAD drawing…GaryAugust 8, 2025
Buildings Two New Buildings NMRA Division 1 of the Lone Star Region had a group build two months ago. …GaryAugust 6, 2025
Track Staging Tracks Part 3 All 10 staging track curves are done. Originally the CAD drawing used left hand 3-ways. …GaryAugust 5, 2025
Track Laying Staging Tracks Before laying the staging tracks, the tangent to the curves had to be determined. Since…GaryAugust 2, 2025
ConstructionTrack Ready to Lay Staging Tracks Cork sheeting has been applied to the staging area. I had used rolled cork in…GaryJuly 31, 2025
ElectricalTrack Decoder Pro Communications Solved Tom Pearson and Harold Berenzweiq came over for a second time to help with EasyDCC…GaryJuly 31, 2025
Construction Staging Benchwork Completed The staging area had plywood just lying there for several months. Today splice plates were…GaryJuly 26, 2025
Electrical EasyDCC and DecoderPro Not Communicating For some reason I have been unable to get the computer to program locos. I…GaryJuly 11, 2025
Operations Labeling Locations Labels really add to the enjoyment of visiting operators and even regular ones. I worked…GaryMay 18, 2025
ConstructionOperations Uncoupling Pick Holders Pick holders were hot-glued in place to the right of each clipboard holder. Originally 2…GaryMay 17, 2025
ConstructionOperations First Train on Layout to Run Today is a Red-Letter Day! The first train left Gerber for Redding and returned. The…GaryMay 16, 2025
ConstructionLaser Structures A Month of Finishing Up A lot of fine tuning the trackwork was a time-consuming job. First of all, the…GaryMay 9, 2025