Construction Gerber Fascia Complete All those dangling blocks of wood with slide switches mounted are now installed for Gerber…GaryApril 25, 2024
Construction Long Pause It is scary to look at the calendar and blog and realize I have not…GaryApril 20, 2024
Construction Benchwork Finally Complete The benchwork that connect the swing gate at the door was finished today. That completes…GaryJune 30, 2023
Construction Undoing Progress One tries to keep moving forward, but today was a step backwards. Don Winn visited…GaryJune 5, 2023
Construction Progress on a New Section I'm back to work after a 10 day break with visitors and car shopping. First…GaryJune 2, 2023
Construction Swing Gate Installed The valance at the door was 70" high. I had no problem as I'm magically…GaryMay 18, 2023
Construction Moving On The 45' long Gerber Yard has been finished with the exception of a operating scale…GaryMay 16, 2023
Construction Entry Swing Gate Had a great time over Easter with grandkids but little was done on the layout. …GaryApril 12, 2023
Construction East End of Gerber Yard Started The last few days have been used putting down cork. The main yard is on…GaryMarch 31, 2023
Construction Mistakes, Lessons Learned Back on track after a wonderful visit with grandkids. My son-in-law helped me rip enough…GaryMarch 24, 2023
Construction Proberta Awaits Track The roll cork for Gerber was not delivered yet, so worked on Proberta instead. I…GaryMarch 12, 2023
Construction Gerber & Proberta Ready for Cork The plywood base for Gerber and Proberta has been screwed down to the joists and…GaryMarch 8, 2023
Construction Plywood Base Added A friend came over and we moved all the plywood left from the raised walkway…GaryMarch 1, 2023
Construction Divider Backdrop With warm weather and little wind yesterday, 20 sheets of backdrop were painted with a…GaryFebruary 10, 2023
Construction Odds & Ends A friend, Barry Gates, came over on January 27 to see the progress and stayed…GaryFebruary 8, 2023
Construction Carpeting Done Laid out final 45' long benchwork, attached joists, and finished carpeting. L-girder is laid out…GaryJanuary 20, 2023
Construction Framework Rises – Part 3 Spent a day replacing an outside door that the contractor had done incorrectly. The 3rd…GaryJanuary 10, 2023
Construction Framework Rises – Part 2 Legs were place under the 45' of the Gerber Yard today. Each section of L-girder…GaryJanuary 5, 2023
Construction Framework Rises I put down more carpet until I ran out of the grey carpet needed to…GaryJanuary 3, 2023
Construction Peninsula Framework I have completed the framework for the two peninsulas and have propped them up against…GaryDecember 18, 2022