Skip to main content

Moving On

By May 16, 2023April 20th, 2024Construction1 min read

May 16, 2023

The 45′ long Gerber Yard has been finished with the exception of a operating scale track that still needs to be built.

Two boxes have been built and located on either side of the door to support the swing gate.  Light switches had to be rewired and moved to the front of the left box.  Please excuse the mess.

Leave a Reply