Spent a day replacing an outside door that the contractor had done incorrectly.

The 3rd peninsula went up today.  If you look at the track plan, it will be  Cottonwood and Red Bluff.

I found the thicker black line that I was using with as my laser guide should be thinner to be more accurate.  When checking with a digital level, there were places off by .2 degrees.  Now getting much better accuracy.