Framework Rises – Part 2

By January 5, 2023April 20th, 2024Construction1 min read

January 4, 2023

Legs were place under the 45′ of the Gerber Yard today.  Each section of L-girder was 8′ long.  My laser continues to be an invaluable tool in ensuring everything is level.

All needed parts were precut and drilled for the entire assembly before starting.  My wife would help lift a section as we clamped legs underneath.  Her main complaint was that she was being interrupted about every 30 minutes to lift the next section.  She is such a great helper.