Skip to main content

West End Gerber Yard Finished

By May 1, 2023Layout Progress1 min read

May 1, 2023

The west part of Gerber yard track laying has been completed.  This finishes 30′ of the 45′ long yard.  I’m starting work on a scale track today.

I’ve also been working on combining images that I took of the actual area to use as a photo backdrop.  This is part of a 30′ long image for Proberta.  I’m printing sections 6″ high on vinyl photo paper.  4 of them will fit on a 24″ wide sheet.  This means only 8′ of paper will be used.  Sky will be trimmed off when installing.

The bottom image was part of the original 8 photographs that were combined to make the 7′ long panorama photo.  It was flipped in the sample included and would be on the left side.  On1Raw was used to make the panorama and to remove any post 1926 features.  Multiple strips are being combined to make a longer panorama in Photoshop CS6.

Next Post

Leave a Reply