Skip to main content

Peninsula Framework

By December 18, 2022Layout Progress1 min read

December 18, 2022

I have completed the framework for the two peninsulas and have propped them up against the wall so I can start carpeting.  Before removing the paper pattern, I mark the location of key points on the floor using a construction crayon.  When putting down carpet tiles, I measure each key point from existing tiles and mark the tile that will cover up the key with a Sharpie Wet Erase Chalk Medium Tip White Wet Erase Chalk Marker.  Water will remove it later.

I bought the carpet tiles for the previous layout but never laid them.  They are close to 20 years old and never had much adhesive (Milliken Legato), so I put down double sided adhesive tape the length of the room before installing each new row of tiles.

Once I get tiles down, I can move the sections of benchwork back in place and install the legs.

Leave a Reply