August 8, 2025
All switches for the east end of staging were laid down on a CAD drawing which was stapled to the cork surface. They were made to fit and throwbar locations marked for drilling 1/2″ holes which Tortoise throwrods would be inserted. After holes were drilled the paper was removed and group of switches traced around, DAP applied, and track weighed down until DAP cured.
Microsoft Publisher was used to design the panel fascia that LED’s and pushbuttons could be added to for the Adrino control of the staging.